abi <abi/4.0>,
include <tunables/global>

profile "doitify-desktop" "/opt/Doitify/doitify-desktop" flags=(unconfined) {
  userns,

  # Site-specific additions and overrides. See local/README for details.
  include if exists <local/doitify-desktop>
}